דלג לתוכן הראשי
Osaka 2025 Expo Site

Osaka 2025 Expo Site

ოზაკა 2025 ექსპო სიტი

4.5
On request
Price from /m²
100%
Built
Completed (2025)
Handover
0
Flats

Yumeshima, Osaka Handover Completed (2025) 0 flats

Details

Price from /m²
On request
Built
100%
Handover
Completed (2025)
Flats
0 flats
Location
Yumeshima, Osaka, Osaka

Building in 3D

טוען מפת תלת-ממד…

8 floors · 0 flats · 100% built · hover a floor

Area25°מתבהר

Country
Japan
City
Osaka
Address
Yumeshima, Osaka

夢洲 · 330 m · 4 min

About the project

World Expo 2025 site on Yumeshima island, to be converted to an integrated resort.

Frequently asked questions

How much is a square meter in Osaka 2025 Expo Site?

Osaka 2025 Expo Site — Yumeshima, Osaka. Prices are available on Sivrce.

When will Osaka 2025 Expo Site be handed over?

Handover date: Completed (2025). Construction progress: 100%. Total 0 flats.

Which frame condition are apartments sold in at Osaka 2025 Expo Site?

New developments in Georgia are typically sold in three conditions: black frame (shell only), white frame (ready for renovation — plaster, wiring, screed) and green frame (near-complete). Confirm the exact condition for Osaka 2025 Expo Site with the developer's sales office.

Can I buy an apartment in Osaka 2025 Expo Site with an installment plan or mortgage?

You can buy in Osaka 2025 Expo Site with a developer installment plan (typically 10–30% down, payments until handover) or a bank mortgage. Confirm details with the developer or contact us on Sivrce.

Is buying in Osaka 2025 Expo Site a good investment?

Buying under construction is usually cheaper than a completed unit — prices rise toward handover. Rental yield and ROI in Osaka depend on the district and frame condition; compare similar projects on Sivrce.

מתעניינים?

Osaka 2025 Expo Site עונה — בדרך כלל תוך כמה שעות

0/1000

ביקורות

טוען…
התקשר