Անցնել հիմնական բովանդակությանը
Timber Peak

Timber Peak

ტიმბერი პიკი

UBM Development AG
4.5
On request
Price from /m²
100%
Built
Completed (2025)
Handover
180
Flats

Zollhafen, Frankfurt Handover Completed (2025) 180 flats

Details

Price from /m²
On request
Built
100%
Handover
Completed (2025)
Flats
180 flats
Floors
12 floors
Location
Zollhafen, Frankfurt, Frankfurt

Building in 3D

3D քարտեզը բեռնվում է…

12 floors · 180 flats · 100% built · hover a floor

Area19°Ամպամած

Country
Germany
City
Frankfurt
Address
Zollhafen, Frankfurt

About the project

Smart timber-hybrid smart tower with photovoltaic facade and zero-carbon smart energy grid.

Frequently asked questions

How much is a square meter in Timber Peak?

Timber Peak — Zollhafen, Frankfurt. Prices are available on Sivrce.

When will Timber Peak be handed over?

Handover date: Completed (2025). Construction progress: 100%. Total 180 flats, up to 12 floors.

Which frame condition are apartments sold in at Timber Peak?

New developments in Georgia are typically sold in three conditions: black frame (shell only), white frame (ready for renovation — plaster, wiring, screed) and green frame (near-complete). Confirm the exact condition for Timber Peak with the developer's sales office.

Can I buy an apartment in Timber Peak with an installment plan or mortgage?

You can buy in Timber Peak with a developer installment plan (typically 10–30% down, payments until handover) or a bank mortgage. Confirm details with the developer or contact us on Sivrce.

Who builds Timber Peak?

Developer: UBM Development AG. Full profile, other projects and reviews: sivrce.ge/developers/ubm-development.

Is buying in Timber Peak a good investment?

Buying under construction is usually cheaper than a completed unit — prices rise toward handover. Rental yield and ROI in Frankfurt depend on the district and frame condition; compare similar projects on Sivrce.

Հետաքրքրված ես?

Timber Peak պատասխանում է — սովորաբար մի քանի ժամում

0/1000

Կարծիքներ

Բեռնվում է…
Զանգել