Bathroom Renovation Calculator 2026 — Tile, Waterproofing, Plumbing

Enter your bathroom dimensions and tile price — we compute the full budget from demolition to the door with real 2026 Georgian rates.

Calculate

Total budget
₾3,922
Per bathroom m²: ₾981 · Floor area: 4 m² · Tile area (walls + floor): 25 m²
Rates 2026
₾25 + ₾13 + ₾18 /m²
Tile (material, +10% waste)₾1,109
Tiling labour₾616
Adhesive + grout₾320
Waterproofing (2 coats)₾337
Demolition and debris removal₾560
Water/sewage rough-in (4 points)₾600
Door with install₾380

2026 market guide · materials + labour · sanitary ware (toilet, taps, shower) is separate — budget ₾600–3,000 · the market spreads about ±15%

Rates 2026

Mid-market Tbilisi rates the calculator uses.

WorkRate
Tiling labour₾25/m²
Adhesive + grout₾13/m²
Waterproofing (2 coats)₾18/m²
Demolition and debris removal₾140/m²
Water/sewage rough-in₾150
Door with install₾380
Electric underfloor heating₾60/m²

Frequently asked questions

How much does a full 3–4 m² bathroom renovation cost?

With mid-range tile (₾40–60/m²) — ₾4,500–6,500 excluding sanitary ware. Ware (toilet, taps, shower system) adds ₾600–3,000 depending on brand.

Why does waterproofing matter so much?

The floor and the lower wall band at wet points get two coats — it is the only protection against flooding the flat below. An ₾18/m² coat is the cheapest insurance in the whole renovation.

Does mosaic or large-format tile cost the same to lay?

No — ₾25/m² is for standard formats with straight geometry. Mosaic and 60×120 formats add up to 40% to laying labour and are quoted separately.

How long does a bathroom renovation take?

For 3–4 m²: demolition and plumbing — 3–5 days, waterproofing and curing — 2–3 days, tiling — 5–8 days. Roughly 10–15 working days total.

Bathroom renovation pros